The History of Long Island MacArthur Airport

Матеріал з HistoryPedia
Версія від 01:49, 1 березня 2018, створена Donaldtune3 (обговореннявнесок) (Створена сторінка: Northeastern International AirlinesMarket studies had long indicated the need for nonstop Long Island-Florida service because of its concentration of tourist at...)

(різн.) ← Попередня версія • Поточна версія (різн.) • Новіша версія → (різн.)
Перейти до: навігація, пошук

Northeastern International AirlinesMarket studies had long indicated the need for nonstop Long Island-Florida service because of its concentration of tourist attractions and to limo westchester ny facilitate visits between Long Island children and Florida-relocated retiree parents. The construction of the West Arrivals Wing and the East Departures Wing, the gift shop expansion, and the central security checkpoint relocation.7. The Southwest-financed, quad-gate addition, increasing the number of departure gates from 19 to 23.Victim, like all airports, to post-September 11 traffic declines, Long Island MacArthur Airport lost eight daily departures operated by American Eagle, Delta Express, and US Airways Express, although the airport's October 2001 passenger figures had only been six percent below those of the year-earlier period. No nonstop destinations had, however, been severed. With Delta Express's daily 737-200 Florida flight frequency having been progressively reduced from an all-time high of seven to just one--to Fort Lauderdale--its operations could be divided into three categories:1. Turboprop regional2. Pure-jet regional3. SouthwestNevertheless, in the four years since Southwest had inaugurated service, the airport had handled 8,220,790 passengers, or an annual average of two million. Without Southwest, it would, at best, have handled only half that amount.On April 30, 2003, for the second time in a five-year period, Long Island MacArthur Airport broke ground on new terminal facilities. Designed by the Baldassano Architectural Group, the Long Island architectural firm which had completed the $13.2 million airport expansion and modernization program in 1999, the new, 154,000-square-foot, four-gate addition was constructed on the north side of the existing east concourse which had housed Southwest's operations. Citing increased space and potential growth as reasons for the new facility, Southwest claimed that the existing three gates, which had fielded a combined 24 daily departures, had reached their saturation point and that additional "breathing room" for both passengers and employees had been needed, particularly during flight delays. The net gain of an additional gate, which would be coupled with larger lounges, would eventually facilitate eight additional flights to new or existing US destinations, based upon market demand.The project, initially pegged at $42 million, but later increased to $62 million, was financed by Southwest, which sought government reimbursement with the Town of Islip for up to $18 million for the non-airline specific construction aspects, such as airfield drainage, which was considered a common-use utility.The 114,254-square-foot, Southwest-funded and -named Peter J. McGowan Concourse officially opened at the end of November 2004. Accessed by a new awning-protected entrance from the airport's terminal-fronted curbside, the new wing, connected to the existing passenger check-in area, curved to the left past the flight arrival and departure television monitors to the new, large security checkpoint from where passengers ascended, via two escalators, to the upper level departures area.Concurrent with the opening had been the announcement that Southwest would now proceed with Phase II of its expansion by building a second, $20 million addition which would connect the new concourse with the old, altogether replacing the east concourse which had served it since it had inaugurated service in 1999. The project incorporated four more gates, for a total of eight, enabling up to 80 daily departures to be offered.6.